-
-
PAN India Operations
Utility Scale Solar EPC | Civil Infrastructure | Industrial Construction
PAN India Operations
Utility Scale Solar EPC | Civil Infrastructure | Industrial Construction
Project Milestones
Terrawatt Engineering Pvt. Ltd. has completed the 2.8 MW solar park at Dharangaon, Jalgaon district, Maharashtra. The project was executed under the PM Kusum Yojana scheme, with GH2 Energy Pvt. Ltd. as principal contractor and Infisol Green Energy Pvt. Ltd. as EPC contractor.
PM Kusum Yojana (Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan) is a Government of India initiative aimed at increasing solar capacity in agricultural regions, providing farmers with reliable energy access while contributing to the country’s renewable energy targets. Terrawatt’s successful delivery under this scheme demonstrates the company’s ability to execute within government programme frameworks with strict compliance and documentation requirements.
The Dharangaon project scope included civil works, mounting structure installation, electrical infrastructure, and full site development. Combined with the 9.1 MW Paldhi Solar Park, Terrawatt has now delivered 11.9 MW of commissioned solar capacity across the Jalgaon district operating under both state utility (MAHAGENCO) and national agricultural solar (PM Kusum Yojana) frameworks.
Kushal Agrawal, [TITLE] of Terrawatt Engineering, noted: “Executing under PM Kusum Yojana requires a level of compliance and documentation rigour that goes beyond standard solar EPC delivery. Our integrated model where the same team handles civil, electrical, and solar scope simplifies that compliance because there are fewer coordination gaps for auditors to find.”
Leave your thought here
Your email address will not be published. Required required fields are marked